School-determined Budget

$1,620,000

Original Construction Date

1957

*Note: 2016 Bond Budget represents direct construction costs. Not inclusive of design and management services, insurance allocations and inflation.

Project Updates

 Quality Learning Environments

Status: Scheduled for completion in 2020
Scope of Work:
  • Funding to make school determined, high-impact investments that may include areas such as classroom upgrades, furniture upgrades, or common space upgrades (front office, gymnasium, cafeteria).

 Maintenance

Status: Complete
Scope of Work:
  • Classroom level air conditioning solution
  • Replace boiler and storage tank
  • Improve existing cooling and ventilation systems

Technology and Safety

Status: Complete
Scope of Work:
  • Additional funding for student devices
  • Network and infrastructure
  • Safety investment in door hardware to support lockdown and upgrading existing systems

Construction Updates

2012 Bond

Bond Investment (Approximate):

$533,004

Key Project Elements:

Elevator improvements; replace A/C in telecommunications room; cooling enhancement; code upgrades; ADA improvements; correct safety issues in science rooms; student technology.