Manual: Manual High School and McAuliffe Manual Middle School

School-determined Budget

$60,000 Manual HS
$30,000 McAuliffe Manual

Original Construction Date

1953

Facility Type

Shared Campus

*Note: 2016 Bond Budget represents direct construction costs. Not inclusive of design and management services, insurance allocations and inflation.

manual

Project Updates

 Quality Learning Environments

Status: Complete
Scope of Work:
  • Create MS main office
  • Create MS specialized rooms (i.e.science lab)
  • Funding to make school determined, high-impact investments that may include areas such as classroom upgrades, furniture upgrades, or common space upgrades (front office, gymnasium, cafeteria)

 Maintenance

Status: In progress
Scope of Work:
  • Interior LED lighting upgrade
  • Repair/update exit lighting for fire safety
  • Replace boiler and storage tank
  • Replace boiler components
  • Safety upgrades in kitchen
  •  Improve existing cooling and ventilation systems

Technology and Safety

Status: Complete
Scope of Work:
  • Additional funding for student devices
  • Network and infrastructure
  • Safety investment in door hardware to support lockdown and upgrading existing systems

Construction Updates

2012 Bond

Bond Investment (Approximate):

$4,240,000

Key Project Elements:

Science Room renovations; cooling enhancement; galvanized piping; pool piping and equipment; mechanical; replace A/C in telecommunications room; fire alarm and detection; ADA improvements; code upgrades; kitchen hood; concrete stair repair; student technology.