Kunsmiller Creative Arts Academy

School-determined Budget

$200,000

Original Construction Date

1957

*Note: 2016 Bond Budget represents direct construction costs. Not inclusive of design and management services, insurance allocations and inflation.

kunsmiller

Project Updates

 Quality Learning Environments

Status: Not started (2019 project) 
Scope of Work:
  • Funding to make school determined, high-impact investments that may include areas such as classroom upgrades, furniture upgrades, or common space upgrades (front office, gymnasium, cafeteria).

 Maintenance

Status: In progress (2017 projects complete) 
Scope of Work:
  • Classroom level air conditioning solution
  • Install Fire Sprinklers
  • Interior LED lighting upgrade
  • Repair exterior stairs
  • Repipe kitchen waste line
  • Replace boiler and storage tank
  • Replace exterior door locks
  • Replace technology-related cooling systems
  • Safety upgrades in kitchen
  • Improve existing cooling and ventilation systems
  • Replace playing field artificial turf

Technology and Safety

Status: Complete
Scope of Work:
  • Additional funding for student devices
  • Network and infrastructure
  • Safety investment in door hardware to support lockdown and upgrading existing systems

Construction Updates

2012 Bond

Bond Investment (Approximate):

$3,735,624

Key Project Elements:

Roofing; replace A/C in telecommunications room; cooling enhancement; fire alarm and detection systems; theater and stage equipment; code upgrades; ADA improvements; maintenance on boilers; egress lighting; student technology.