Valverde

2030 W Alameda Ave, Denver, CO 80223

Year Built: 1923


2012 Bond

2012 Bond Investment (Approximate): $1,188,956

2012 Key Project Elements:

Roofing; cooling enhancement; replace A/C in telecommunications room; cold water supply; code upgrades; freezer/cooler replacement; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $60,000

Proposed 2016 Bond Key Projects:

Exterior LED lighting upgrade; Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Repair/update exit lighting for fire safety; Replace boiler and storage tank; Replace boiler components; Replace galvanized piping; Replace hot water tank; Replace technology-related cooling systems; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure