Steele

320 S Marion Pkwy, Denver, CO 80209

Year Built: 1913


2012 Bond

2012 Bond Investment (Approximate): $1,831,411

2012 Key Project Elements:

Replace A/C in telecommunications room; cooling enhancement; potable water distribution; code upgrades; ADA improvements; interior signage; replace stage curtains; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $90,000

Proposed 2016 Bond Key Projects:

Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Masonry repairs; Repair boiler room ceiling; Repair/update exit lighting for fire safety; Replace Fire Alarm and Detection System; Replace selected roofing; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure