Smith Renaissance School

3590 Jasmine St, Denver, CO 80207

Year Built: 1954


2012 Bond

2012 Bond Investment (Approximate): $1,404,635

2012 Key Project Elements:

Cooling enhancement; code upgrades; replace boilers and pumps; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $80,000

Proposed 2016 Bond Key Projects:

Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Repair/update exit lighting for fire safety; Replace boiler and storage tank; Replace boiler components; Resurface parking lot; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure