Knapp

500 S Utica St, Denver, CO 80219

Year Built: 1956


2012 Bond

2012 Bond Investment (Approximate): $563,430

2012 Key Project Elements:

Cooling enhancement; code upgrades; ADA improvements; egress lighting; replace A/C in telecommunications room; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $120,000

Proposed 2016 Bond Key Projects:

Exterior LED lighting upgrade; Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Repair exterior stairs; Replace exterior door locks; Replace water heater/tank; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure