Holm

3185 S Willow St, Denver, CO 80231

Year Built: 1973


2012 Bond

2012 Bond Investment (Approximate): $418,817

2012 Key Project Elements:

Accessible restroom; replace A/C in telecommunications room; interior signage; code upgrades; replaced cooling tower and boilers; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $100,000

Proposed 2016 Bond Key Projects:

Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Repair/update exit lighting for fire safety; Resurface parking lot; Safety upgrades in kitchen; Close open walls that disrupt learning; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure