Doull

2520 S Utica St, Denver, CO 80219

Year Built: 1955


2012 Bond

2012 Bond Investment (Approximate): $771,996

2012 Key Project Elements:

Code upgrades; quarry tile in kitchen; code upgrades; replace A/C in telecommunications room; ADA improvements; cooling enhancements; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $100,000

Proposed 2016 Bond Key Projects:

Exterior LED lighting upgrade; Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Replace boiler and storage tank; Replace boiler components; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure