Denison Montessori

1821 S Yates St, Denver, CO 80219

Year Built: 1959


2012 Bond

2012 Bond Investment (Approximate): $934,216

2012 Key Project Elements:

Code upgrades; new hot water storage tanks; replace A/C in telecommunications room; ADA improvements; cooling enhancements; library storage remodel; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $300,000

Proposed 2016 Bond Key Projects:

Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Repair/update fire alarm system; Replace boiler and storage tank; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure; Interior LED lighting upgrade; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure