Cory

1550 S Steele St, Denver, CO 80210

Year Built: 1950


2012 Bond

2012 Bond Investment (Approximate): $1,202,350

2012 Key Project Elements:

Fire alarm and detection systems; new hot water storage tanks; cooling enhancement; code upgrades; student technology.


2016 Bond

Proposed 2016 Bond School-Determined Budget (Approximate): $80,000

Proposed 2016 Bond Key Projects:

Improve existing cooling and ventilation systems; Interior LED lighting upgrade; Replace galvanized piping; Funding to make school determined; high-impact investments that may include areas such as classroom upgrades; furniture upgrades; or common space upgrades (front office; gymnasium; cafeteria); Additional funding for student devices; Network and infrastructure